Company News
As part of our routine quality control procedures, we recently conducted PT (penetrant) testing on the weld seams and surfaces of the front-end gas nozzles and valve piping of our burners. The results met the applicable standard requirements with no reportable defects. This testing is one of several in-process inspections we perform on critical pressure parts before assembly. Through such step-by-step checks, we maintain layered quality control throughout the manufacturing process, ensuring reliable component condition prior to final assembly and commissioning.



